
Wamsley Bathroom
Start date: 2/14/2018
End date: 4/20/2018
SCOPE OF WORK:
Removed existing cabinetry, shower, tub unit, flooring and toilet. Expanded shower area, added tile walls, tile shower floor and shower ceiling. Added Steam shower unit. New shower door. New plumbing fixtures installed. New vanity. New LVT Flooring. Updated fireplace wall (floor to ceiling).
PRODUCTS:
Executive Cabinetry
Coarse Botticino Zodiaq Quartz Counter Tops
Pulls and Knobs from Top Knobs
Armstrong Alterna Buff – LVT flooring
American Olean Pozzalo tile (shower)
Kerdi waterproofing system
Luxart Accessories
Kohler Steam Generator
Vanity Lights and Venting Unit from The Stock Market
Frameless shower door